The Top Paddock

Project Description:
The Top Paddock is a multi-stage, 250+ lot subdivision in Ascot. This large subdivision, currently releasing Stage 5, is located just north of Bendigo.

Read more ...

Holdsworth Hills Estate

Project: Holdsworth Hills Estate
Client: Arbor Estates Pty Ltd
Responsible Authority: City of Greater Bendigo
Construction Contractor: Dunlop & Pitson Earthmoving
Timeframe: 2008 -
Location: White Hills

Project Description:

30 lot residential subdivision, with council reserve. Water sensitive urban design has been implemented on site to treat rainfall runoff.  A bio-retention basin has been designed to remove suspended solids, phosphorus and nitrogen from the development before entering the council drainage system.

Read more ...

Ascot Park, Ascot

Project Description:
Seven stage, 100 lot residential subdivision within the Epsom-Huntly growth corridor approximately 5km north of the Bendigo CBD. The project included coordination and design of infrastructure to service the development and subsequent project management.

Read more ...

Arbor Place, White Hills

Project: Arbor Place, White Hills
Client: Arbor Estates Pty Ltd
Responsible Authority: City of Greater Bendigo
Construction Contractor: Dunlop & Pitson Earthmoving
Timeframe: 2008 - 2009
Location: White Hills

Project Description:
30 lot residential subdivision, with council reserve. Water sensitive urban design has been implemented on site to treat rainfall runoff. A bio-retention basin has been designed to remove suspended solids, phosphorus and nitrogen from the development before entering the council drainage system.

Services Provided:
Planning, engineering design, works supervision, contract administration and project management.

Perricoota Waters, Moama

Project: Perricoota Waters, Moama
Client: KSK Developments Pty Ltd
Responsible Authority: Murray Shire
Construction Contractor: Kennaugh Earthmoving Contractors
Timeframe: TBA
Location: Perricoota Road, Moama

Project Description:
This is a private 81 lot tourist/resort development approximately 11km west of the Moama township abutting the Murray River. Works included the provision of all services including roads, drainage, water, sewer, power, telecommunications, on-site water and raw-water treatment facilities, boat ramp and ornamental lake.

Read more ...

Ascot Sewer, Ascot

Project: Ascot Sewer, Ascot
Client: Coliban Water
Responsible Authority: City of Greater Bendigo
Construction Contractor: TBA
Timeframe: 2008 - 2009
Location: Sullivan Street – Ironstone Road, Ascot

Project Description:
The design of a 1.5 km trunk sewer to service the urban development area of Ascot, approximately 5 km north of the Bendigo CBD. The design involved analysis of the existing sewer system (including capacities of existing rising mains and pump stations) and detailed investigation into future loadings and service requirements.

Read more ...

Inglewood, Raw Water Pipeline, Inglewood

Project: Inglewood Raw Water Pipeline, Inglewood
Client: Loddon Shire
Responsible Authority: Loddon Shire
Construction Contractor: TBA
Timeframe: TBA
Location: Inglewood

Project Description:
Piping of water from Inglewood Reservoir to the Inglewood Recreation Reserve to provide raw water for maintenance of recreational facilities.

Read more ...

Edgecombe Road Pump Station, Kyneton

Project: Edgecombe Road Pump Station, Kyneton
Client: Coliban Water
Responsible Authority: Macedon Ranges Shire
Construction Contractor: Armstrongs P/L
Timeframe: 2006
Location: Edgecombe Road, Kyneton - 1km west of the Kyneton CBD

Project Description:

Replacement and relocation of the existing pump station servicing the Kyneton Bushland Resort and surrounding area.

Read more ...

Lakeview Estate, Moama - Stage 1

Project: Lakeview Estate, Moama - Stage 1
Client: KPD Perricoota Pty Ltd
Responsible Authority: Murray Shire
Construction Contractor: Dunlop and Pitson Earthmoving
Timeframe: 2006
Location: Perricoota Road, Moama - 2Km west of the Moama township and within 500m of the Murray River.

Project Description:

Stage One is 15 lots of a proposed low density residential development (average 2,000m 2 ) which will ultimately yield approximately 160 allotments. This initial stage included the construction of the dual carriage entrance road and ornamental lake.

Read more ...

RiverWalk Estate, Kyneton

Project: RiverWalk Estate, Kyneton - Stage 1
Client: Campaspe Property Developments Pty Ltd
Responsible Authority: Macedon Ranges Shire
Timeframe: 2005-2006
Location: High Street, Kyneton - 1Km east of the Kyneton CBD abutting the Campaspe River

Project Description:

Stage 1 is 17 lots of a proposed residential development (average 1,370m 2 ) which will ultimately yield 99 allotments. This initial stage included the construction of the dual carriage entrance road and general landscaping.

Read more ...

Heathcote Hospital

Project: Heathcote Hospital Drainage Mitigation, Heathcote
Client: McIvor Health and Community Services
Responsible Authority: City of Greater Bendigo
Timeframe: 2006
Location: Heathcote Hospital, Heathcote

Project Description:

Piped drainage and pavement works to eliminate nuisance flooding to the rear of the hospital. The works also included formalisation and paving of the existing carpark and helipad.

Read more ...

River Town Estate, Cobram

Project: River Town Estate, Cobram 
Client: Cobram Property Developments Pty Ltd
Responsible Authority: Moira Shire Council
Timeframe: 2003-2006
Location: Campbell Road, Cobram

Project Description:

Completion of stages 1 and 2 being 52 lots of a total 118 lot residential subdivision within the Cobram township. The subdivision is within 1km of Cobram CBD and abuts the Cobram Sports precinct.

Read more ...