Inglewood, Raw Water Pipeline, Inglewood
Project: Inglewood Raw Water Pipeline, Inglewood
Client: Loddon Shire
Responsible Authority: Loddon Shire
Construction Contractor: TBA
Timeframe: TBA
Location: Inglewood
Project Description:
Piping of water from Inglewood Reservoir to the Inglewood Recreation Reserve to provide raw water for maintenance of recreational facilities.
Works Include:
Design of delivery pipeline (length – 2.3Km)
Design of Inglewood Reservoir outlet works (Floating arm off-take & gravity fed outfall pipe through the existing reservoir embankment).
Estimated Cost for Construction: $350,000.00
Services Provided:
Planning, project feasibility, engineering design